Drij Borren ecoviaduct

Region

Brussels Tervuren

Project status

Planned

A new connection for fauna and flora

The ground underneath the viaduct of Kasteel Drij Borren has been deepened to create an optimal ecological connection.

The original landscape was radically altered by the construction of the viaduct in the 1960s. Currently, an embankment under the viaduct splits the valley in two. As a result, the site does not adequately function as an ecological connection.

We are relocating the car park, connecting the cycle path to the viaduct and digging away the embankment. As such, the original landscape has been restored and the forest has been brought back together.