Works on the Albert I-laan

Start of the works

18/11/2019

End of the works

15/05/2020

Region

Vilvoorde

Project status

Realised

The works on the Albert I-laan are part of the Ring trambus project.This street is part of the final route of the Ring trambus. We are simultaneously working on safe and comfortable cycling infrastructure on the Albert-I laan.

Renewed intersections for the Ring trambus

The intersections with the Middelburgplein and the Poststraat and the roundabout with the Koning Boudewijnlaan will be completely overhauled to allow the Ring trambus to pass throughThat way, the 24-metre-long Ring trambus will be able to easily pass through these areas.

Full-fledged bicycle path along the Albert I-laan

On the north side of the Albert I-laan there is a separate two-way bicycle path over a length of almost 2 kilometres, safely shielded from the roadway with a hedge. Adapted crossing points have been installed at the Middelburgplein, the Koning Boudewijnlaan and the Poststraat.

Bewonersbrieven

11 nov. '19 Albert I-aan x Koning Boudewijnlaan
Pdf341.26 kB
Download
11 nov. '19 Albert I-laan x Middelburgplein
Pdf344.96 kB
Download
11 nov. '19 Albert I-laan x Poststraat
Pdf111.32 kB
Download

Ontwerpplannen

5 nov. '19 Ontwerpplan Koning Boudewijnlaan
Pdf1.15 MB
Download
5 nov. '19 Ontwerpplan Poststraat
Pdf796.75 kB
Download
10 jan. '20 Ontwerpplan Middelburgplein2
Pdf1.04 MB
Download