F28 along the A12

Bicycle highway

Start of the works

09/10/2018

End of the works

01/10/2019

Region

Grimbergen Meise

Project status

Realised

Along the A12 we constructed the F28, the bicycle highway that will end up connecting Willebroek with Brussels. This first section of the track runs from the N211 in Meise to the Ring and will later extend to the Heysel Complex.

  • On a regional level, connections are planned to bicycle routes going to Antwerp and Boom.
  • The new route creates a green bicycle link between Meise, the Royal Botanic Garden and the Royal Greenhouses of Laeken.

The further development of the F28 along the A12 is also being studied in the project Sneltram A12 Willebroek-Brussels. In the future cyclists will be able to transfer efficiently and safely to the Sneltram.

Inauguration of the cycle highway

On 11 September 2019 the first cycle highway by Werken aan de Ring was inaugurated during a festive neighbourhood party in Meise.

Nieuwsbrieven

10 nov. '18 Nieuwsbrief F28
Pdf390.5 kB
Download