F29 Bicycle highway

Brussels-Leuven

Start of the works

08/2022

End of the works

01/2026

Region

Eastern side Tervuren

Project status

Planned Realised

The ‘Werken aan de Ring’ programme aims to provide better cycling infrastructure. We are building safe bicycle paths and comfortable bicycle bridges and tunnels. They will enable you to cycle quickly and smoothly along and across the Ring. In this way we can offer road users a proper alternative to the car and gradually reduce the number of cars on the Ring. The construction of the F29 bicycle highway, together with a new cycle and pedestrian bridge over Vieramen section, is part of this ambition.

Better bicycle connection between Brussels, Tervuren, Bertem and Leuven

The construction of the F29 bicycle highway will provide a fast, safe and comfortable connection between Brussels, Tervuren, Bertem and Leuven. The future bicycle highway will connect local neighbourhoods, and the construction of bicycle tunnels and bridges will prevent hazardous intersections for pedestrians, cars and public transport. Those that stand out the most are the bicycle and pedestrian bridge over the Vierarmen junction and the cable bridge over the E40. 

We re-laid the bicycle path between Brussels and the Vierarmen junction in Tervuren in the summer of 2022 with a temporary semi-paved surface. We are currently building the bicycle bridge that we will place over the hazardous Vierarmen junction in Tervuren in spring 2024. Starting in early 2024, we commenced further construction of the bicycle highway between Tervuren, Bertem and Leuven.

Want to know more about these sub-projects? Then be sure to check out the web pages below!

Tervuren Bertem Leuven

Fiets- en voetgangersbrug Vierarmenkruispunt F29K

The route between the Vierarmen junction and Leuven is part of Regionet Leuven.

This investment in new cycling infrastructure is made possible thanks in part to Flemish Resilience.

Communicatie

Mei 2022_Bewonersbrief_F29 zone 3
Pdf 227.47 kB
Download
Augustus 2022_Brochure_F29
Pdf 11.41 MB
Download
December 2023_Presentatie infoavond Broekstraat_F29
Pdf 37.35 MB
Download
December 2023_Bewonersbrief start aanleg Plateauroute_F29
Pdf 98.56 kB
Download
Januari 2024_Brochure Koning Boudewijnlaan_F29_0
Pdf 5.08 MB
Download

Projectdocumenten

Februari 2021_Tervurenlaan proefproject_F29
Pdf 23.82 MB
Download
November 2022_Technische plannen Tervuren_F29_0
Pdf 24.86 MB
Download
November 2022_Technische plannen Bertem_F29
Pdf 11.56 MB
Download
November 2022_Technische plannen Leuven_F29
Pdf 20.03 MB
Download